Case Study - New Builds - Inverkip

We won the tender to replace this fire damaged property in Renfrewshire. The property was to be insured through NHBC and would have to be built to their standards.

We undertook the full contract which included:- new foundations, new brickwork/blockwork sub-structure/superstructure with an internal timber skin, new roof structure, windows, doors, electrical works, plumbing works, internal decoration, new kitchen, sanitary ware, floors, carpets, tiling and external works which included the levelling of the site, mono blocks to the front driveway, slabs to pathways, new turf to front, side and rear of property, new decking and a disabled ramp to the front entrance of the property. All of which was approved and checked by Building Control and NHBC.

We worked very closely with NHBC, Building Control and the owners on this contract to make sure that this property was built to a very high standard.